CRE provided the design for the taxiway edge lighting layout, LED runway guard lights, electrical circuiting, and signage layout for the Taxiway Bravo Extension Phase II from Taxiway G to H, and Phase IV extension from Taxiway L to N (2300 feet) which also included add alternates for Taxiway B extension from Taxiway N to P (1100 feet) and reconstruction of Taxiway N (675 feet). The scope of work included development of a construction sequence and temporary facilities to minimize/eliminate downtime. Services included design and construction administration.