CRE prepared a set of electrical plans and specifications for the design of the proposed VFD installation at Well 43.  The new VFD replaced the existing constant speed pump motor, which did not provide operating flexibility and had high energy consumption. The project consisted of providing as-built review, pre-design site investigation, electrical site plan and single line diagram, schematics, and installation details of the new VFD installation.  Services included design for Well 43 and construction administration for Arrowhead Ranch WRF UV Replacement.